Alternative power source in case of power outage

The patio home at 5 Cromwell Court is the only one with a basement (finished) and at high risk for flooding given the close proximity of the accumulation basin. In fact, the previous owner reported a minor flooding event in 2011 during hurricane Irene. In order to prevent prolonged lack of power towards our 2 sump pumps, we request your approval for installation of a generator transfer switch by a cerified electrician - we already contacted Tom Wells Electric and they will do the job as soon as we got a written approval for aforementioned instalation.

Sign Petition
Sign Petition
You have JavaScript disabled. Without it, our site might not function properly.

Privacy Policy

By signing, you accept Care2's Terms of Service.
You can unsub at any time here.

Having problems signing this? Let us know.