Say NO to Bauxmite mining in Morangup (Shire of Toodyay)

Bauxite Alumina Joint Ventures/Bauxite Resources Limited (BAJV/BRL) are proposing a 62 square kilometre bauxite mine. If this goes ahead the following activities will occur:

• Large scale land clearing
• Top soil stripped to reveal ore
• Ore loaded onto 190 tonne Haul trucks
• Trucked to crushing/screening plant (to be built).
• Ore loaded onto conveyor belt (which will have to cross Toodyay Road, under or over).
• Ore deposited and loaded at Rail Head at a rail siding (to be built). Shipped to port destination China.
• Millions of litres of wasted water

If this project goes ahead it will have an irreversible affect on the environment.
firma la petición
firma la petición
Has deshabilitado JavaScript. Sin este programa, puede que nuestro sitio no funcione debidamente.

política de privacidad

al firmar, aceptas los condiciones del servicio de Care2
Puede administrar sus suscripciones por correo electrónico en cualquier momento.

¿Tienes dificultades para firmarla?? Infórmanos.