Oppose wireless tower installation in residential area's

The Green Valley Christian Church is preparing to install a 6 panel wireless telecommunications facility on the church grounds.  Initially proposed conditional use permit for a 50 foot high parking lot light consisting of 6 panel antenna's.  During the resent Public Hearing held at City Hall on May 21, 2008 the hearing is now a continuance pending the redesign of the tower and it's corporation into the steeple and cross.  Continuance is scheduled for June 16, 2008 at city hall 6:30 p.m.  Wireless technology is a industrial business and should not be incorporated with a setting so close in proximity to residential areas.  Yucaipa is a city of a rural nature and we the residents are raising families and believe this industrial venture should be relocated in a commercial / industrial area away from resident's
The Green Valley Christian Church is preparing to install a 6 panel wireless telecommunications facility on the church grounds.  Initially proposed conditional use permit for a 50 foot high parking lot light consisting of 6 panel antenna's.  During the resent Public Hearing held at City Hall on May 21, 2008 the hearing is now a continuance pending the redesign of the tower and it's corporation into the steeple and cross.  Continuance is scheduled for June 16, 2008 at city hall 6:30 p.m.  Wireless technology is a industrial business and should not be incorporated with a setting so close in proximity to residential areas.  Yucaipa is a city of a rural nature and we the residents are raising families and believe this industrial venture should be relocated in a commercial / industrial area away from resident's
firma la petición
firma la petición
Has deshabilitado JavaScript. Sin este programa, puede que nuestro sitio no funcione debidamente.

política de privacidad

al firmar, aceptas los condiciones del servicio de Care2
Puede administrar sus suscripciones por correo electrónico en cualquier momento.

¿Tienes dificultades para firmarla?? Infórmanos.