Renovate the UCCS Engineering Building Lounge

  • par: Victoria C
  • destinataire: Office of the Chancellor
The condition of the Engineering Building has become dilapidated in recent years and has begun to show poorly on the college. Our goal is to renovate our building to a standard that will show well in the community and on campus. The current state of the lounge is detrimental to learning. It does not allow students in engineering to have a quiet, comfortable place where they can study, collaborate, and get things done. I am the Senator of Engineering and it is my hope that we are able to make an impact on the image of our college for our students.
signer
signer
Vous avez désactivé JavaScript sur votre navigateur. Sans JavaScript, il se peut que notre site Internet ne fonctionne pas correctement.

politique de confidentialité

En signant, vous acceptez les conditions de service de Care2
Vous pouvez gérer vos abonnements à tout moment.

Vous ne parvenez pas à signer cette pétition ?? Faites-le nous savoir.