Say NO to Bauxmite mining in Morangup (Shire of Toodyay)

Bauxite Alumina Joint Ventures/Bauxite Resources Limited (BAJV/BRL) are proposing a 62 square kilometre bauxite mine. If this goes ahead the following activities will occur:

• Large scale land clearing
• Top soil stripped to reveal ore
• Ore loaded onto 190 tonne Haul trucks
• Trucked to crushing/screening plant (to be built).
• Ore loaded onto conveyor belt (which will have to cross Toodyay Road, under or over).
• Ore deposited and loaded at Rail Head at a rail siding (to be built). Shipped to port destination China.
• Millions of litres of wasted water

If this project goes ahead it will have an irreversible affect on the environment.
signer
signer
Vous avez désactivé JavaScript sur votre navigateur. Sans JavaScript, il se peut que notre site Internet ne fonctionne pas correctement.

politique de confidentialité

En signant, vous acceptez les conditions de service de Care2
Vous pouvez gérer vos abonnements à tout moment.

Vous ne parvenez pas à signer cette pétition ?? Faites-le nous savoir.