Say NO to Bauxmite mining in Morangup (Shire of Toodyay)

Bauxite Alumina Joint Ventures/Bauxite Resources Limited (BAJV/BRL) are proposing a 62 square kilometre bauxite mine. If this goes ahead the following activities will occur:

• Large scale land clearing
• Top soil stripped to reveal ore
• Ore loaded onto 190 tonne Haul trucks
• Trucked to crushing/screening plant (to be built).
• Ore loaded onto conveyor belt (which will have to cross Toodyay Road, under or over).
• Ore deposited and loaded at Rail Head at a rail siding (to be built). Shipped to port destination China.
• Millions of litres of wasted water

If this project goes ahead it will have an irreversible affect on the environment.
Skriv under
Skriv under
JavaScript er deaktiveret på din computer. Vores websted fungerer muligvis ikke korrekt, hvis ikke JavaScript er aktiveret.

fortrolighedspolitik

ved at underskrive accepterer du Care2's vilkår for tjeneste
Du kan til enhver tid administrere dine e-mailabonnementer.

Har problemer med at underskrive dette? Giv os besked.