Residents demand concessions be made throughout the 65 Ellen Refacing Project

    Illogical and senseless construction site directives have been set in motion by the engineer and contractor for this resurfacing project. Concessions could and should be made to make this 2 year resurfacing project more tolerable, sensible and more equitable for all that live here.
    We the residents demand accountability at all levels. Starting with the Condo Corporation that manages our buildings, the Office Managers, the engineer, contractor and project manager and the board of directors.
    We have been ill managed for too long.
    We are tired of being asked to pay more and receive less.
    Enough is enough.

    It is time we demanded
    signer
    signer
    Vous avez désactivé JavaScript sur votre navigateur. Sans JavaScript, il se peut que notre site Internet ne fonctionne pas correctement.

    politique de confidentialité

    En signant, vous acceptez les conditions de service de Care2
    Vous pouvez gérer vos abonnements à tout moment.

    Vous ne parvenez pas à signer cette pétition ?? Faites-le nous savoir.