PULTY CONSTRUCTION: IMMEDIATE INCLUSION OF PLUMBING LEAKAGE PROBLEMS INTO THE PULTE HOME WARRANTY PL

  • par: Phyllis Miller
  • destinataire: Mr. Richard J. Dugas, Jr., CEO& President, PulteGroup,iNC. AND Mr. Leroy C. Hanneman, Jr., CEO& President, DelWebbCorp

Contrary to Pulte advertising of High Quality Construction, plumbing problems have plagued the subdivision of Split Rail within the Del Webb Sun City Mesquite community in much less (5 years) than the reasonably expected ten year life of the pipe.  Not only have individual residents been damaged with the necessity to repair/replace plumbing from the street to the house, but the roadway has been dug up on several occasions to replace fractured pipe.  This has caused stress and inconvenience to the residents.  Similar incidents have been experienced on other streets within the Split Rail Subdivision and possibly more.

It appears that the Pulte claim of "High Quality Construction" borders on fraud and this petition should, therefore, be honored forthwith.  Ref.: http://pulte-homes.pissedconsumer.com/

signer
signer
Vous avez désactivé JavaScript sur votre navigateur. Sans JavaScript, il se peut que notre site Internet ne fonctionne pas correctement.

politique de confidentialité

En signant, vous acceptez les conditions de service de Care2
Vous pouvez gérer vos abonnements à tout moment.

Vous ne parvenez pas à signer cette pétition ?? Faites-le nous savoir.