Protect Dominion Customers from HUGE rate increases

The proposal to build the Atlantic Coast Pipeline was made four years ago. The energy industry has changed significantly in recent years. Already the cost of the project has risen to $6.5 billion and the costs might continue to rise, especially since not all the necessary permits have been approved. The cost of the pipeline includes a guaranteed 15% rate of return that will be passed along to ratepayers.

Dominion Energy Virginia testified in front of the SCC that they have never studied the need for a new pipeline in Virginia. In 2014 when the ACP was proposed DEV had plans to build two large gas powered electric plants. Since then DEV has canceled their plans to build the plants and have announced they have no plans to build them in the future. Also four of the proposed six large gas powered electric plants planned in NC have also been canceled that would have been served by the ACP.

Dominion Energy has a responsibility to the customers to not proceed with incurring more construction costs for the ACP until Dominion can establish an economic need for the project, all the necessary permits are approved and all the legal challenges have been resolved. It's not fair to be on a path to HUGE rate increases for an unneeded capitol project or due to incompetent implementation.

Ký thỉnh nguyện thư
Ký thỉnh nguyện thư
You have JavaScript disabled. Without it, our site might not function properly.

Privacy Policy

By signing, you accept Care2's Terms of Service.
You can unsub at any time here.

Having problems signing this? Let us know.